01 January 2018, Benghazi, Libya — Repairs have been finished on a Libyan oil pipeline damaged in a suspected attack five days ago and production is restarting gradually, engineers said. The blast and resulting fire on Tuesday about 130 km (80 miles) south of the Es Sider terminal caused a drop in output estimated by …
The post Production restarting after repairs finished on Libyan oil pipeline: engineer appeared first on SweetCrudeReports.
More »
No comments
Post a Comment